ticket: use base32 project record ids
This commit is contained in:
@@ -0,0 +1,40 @@
|
||||
---
|
||||
title: "Audit crate responsibility boundaries"
|
||||
state: "planning"
|
||||
created_at: "2026-05-28T13:13:17Z"
|
||||
updated_at: "2026-05-28T13:13:17Z"
|
||||
---
|
||||
|
||||
## Background
|
||||
|
||||
The workspace has grown across multiple crates (`pod`, `protocol`, `llm-worker`, `manifest`, `client`, `tui`, `memory`, `workflow`, etc.). Before adding more orchestration and policy features, audit whether crate responsibilities, dependency direction, and public interfaces are still clean.
|
||||
|
||||
This is an architecture audit, not an implementation ticket. The output should be actionable findings: either concrete boundary violations to fix, or an explicit statement that the inspected area is acceptable.
|
||||
|
||||
The audit must also check code comments and documentation comments. Comments inside one crate should not explain or justify behavior primarily in terms of a downstream crate that depends on it. If such comments exist, record them because they can indicate inverted ownership or an interface that is leaking caller-specific concerns.
|
||||
|
||||
## Scope
|
||||
|
||||
Inspect the Rust workspace at least for:
|
||||
|
||||
- crate dependency graph and suspicious dependency direction.
|
||||
- public types/functions/modules whose names or contracts expose another crate's implementation details unnecessarily.
|
||||
- code paths where a lower-level crate appears to know about higher-level orchestration, UI, or caller concerns.
|
||||
- comments/doc-comments that mention another crate which depends on the current crate, especially when the comment describes why the dependent crate needs that behavior.
|
||||
- duplicated interfaces or ad-hoc glue that should be owned by a clearer boundary.
|
||||
|
||||
Out of scope:
|
||||
|
||||
- broad refactoring.
|
||||
- formatting-only changes.
|
||||
- changing dependency direction before findings are reviewed.
|
||||
- rewriting comments unless a follow-up implementation ticket is explicitly created.
|
||||
|
||||
## Acceptance criteria
|
||||
|
||||
- A dependency/interface audit summary exists with concrete findings grouped by severity.
|
||||
- The audit names files/modules/functions/comments involved in each finding.
|
||||
- The audit distinguishes actual boundary problems from acceptable dependency-aware documentation.
|
||||
- The audit specifically reports whether comments in crates refer to crates that depend on them.
|
||||
- If no blocking issue is found, the audit explains why the current separation is acceptable.
|
||||
- Follow-up implementation tickets are proposed only for findings that are specific and actionable.
|
||||
Reference in New Issue
Block a user