29 lines
2.0 KiB
Markdown
29 lines
2.0 KiB
Markdown
Ticket `00001KVDETSN6` is complete.
|
|
|
|
Completed implementation:
|
|
- Added a user-visible `dashboard_content_ready` metric that carries and validates a rendered dashboard snapshot rather than treating first frame or a single row as ready.
|
|
- Added expected dashboard content coverage for Ticket rows, Pod rows, Companion status, Orchestrator status, orchestration overlay state, action labels, disabled reasons, local Ticket state, and overlay Ticket state.
|
|
- Added a real git/orchestration overlay fixture for the local-ready / overlay-inprogress case and validated the visible `ready→prog` / `Wait` row.
|
|
- Added negative coverage for missing expected row, wrong state, missing overlay state, and missing action label.
|
|
- Added bounded startup source breakdown including pod metadata/status probing, ticket config probe/parse, overlay validation/read/git checks, ticket scan/parse, local claim scan, pod row materialization, and total workspace panel build.
|
|
|
|
Reviewed / merged:
|
|
- Initial implementation: `fc1ee5bb` (`tui: measure panel dashboard readiness`)
|
|
- Review-fix implementation: `5870251b` (`tui: tighten panel dashboard readiness`)
|
|
- First review requested changes; blockers were fixed.
|
|
- Re-review approved with no remaining blockers.
|
|
- Orchestrator merge commit: `2d4d11e4` (`merge: panel dashboard readiness metric`)
|
|
|
|
Validation in Orchestrator worktree:
|
|
- `cargo fmt --check` — passed
|
|
- `cargo check -p tui --features e2e-test` — passed
|
|
- `cargo test -p yoi-e2e --features e2e --test panel` — passed; 7 passed, 0 failed
|
|
- `git diff --check` — passed
|
|
|
|
Cleanup:
|
|
- Stopped Coder Pod `yoi-coder-00001KVDETSN6`.
|
|
- Stopped Reviewer Pod `yoi-reviewer-00001KVDETSN6-r2`.
|
|
- Removed child worktree `/home/hare/Projects/yoi/.worktree/00001KVDETSN6-panel-dashboard-content-ready`.
|
|
- Deleted merged branch `impl/00001KVDETSN6-panel-dashboard-content-ready`.
|
|
|
|
Root/original workspace was not read/written/merged/validated for this Ticket, per Panel Queue instruction. The completed work is integrated on the Orchestrator branch. |